Newport Harbor Project #1
Home / Portfolio / Project 04

Newport Harbor Project #1

LocationNewport Harbor, Newport Beach
TypeNew Residential Construction
Properties1
Units2
StatusUnder Construction
Project timeline

From acquisition to completion

A harbor-side residence focused on indoor-outdoor flow, natural materials and views toward the water. Scroll down to follow each phase of the project.

01 Property Acquisition02 Demolition & Site Prep03 Forming & Foundation04 Framing & Vertical Structure05 Rough Covering06 Finishes and Completion
Property Acquisition
Property Acquisition
Property Acquisition
Slideshow
01

Property Acquisition

Phase 01 · Completed

We identify and acquire a residential property with the right fundamentals — location, lot potential and long-term neighborhood value — and plan the new home before any work begins on site.

  • Site selection & due diligence
  • Feasibility, design & engineering
  • City approvals & permits
Slideshow + video
02

Demolition & Site Prep

Phase 02 · Completed

The existing structure is demolished and removed, and the site is cleared, excavated and compacted, leaving a clean, level pad ready for the new foundation.

  • Demolition & debris removal
  • Excavation & soil compaction
  • Graded, level building pad
Forming & FoundationDummy media #143photo
Photo
03

Forming & Foundation

Phase 03 · Upcoming

Footings are laid out and trenched, forms are set, rebar, plumbing and utility sleeves are placed, and the concrete foundation is poured and finished.

  • Layout, trenching & forming
  • Rebar, plumbing & underground utilities
  • Concrete pour & finished slab
Framing & Vertical StructureDummy media #144photo
Photo
04

Framing & Vertical Structure

Phase 04 · Upcoming

Lumber arrives on site and the home starts to rise — sill plates, floor framing, walls and roof framing form the bare-wood structure of the residence.

  • Lumber delivery & sill plates
  • Wall, floor & roof framing
  • Bare-wood vertical structure
Rough CoveringDummy media #145photo
Photo
05

Rough Covering

Phase 05 · Upcoming

The structure is closed in and made weather-tight with roof and wall sheathing, roofing, windows and doors, while rough mechanical, electrical and plumbing systems are installed and inspected.

  • Roof & wall sheathing, roofing
  • Windows, doors & weather barrier
  • Rough mechanical, electrical & plumbing
Finishes and CompletionDummy media #146photo
Photo
06

Finishes and Completion

Phase 06 · Upcoming

Interior finishes, landscaping and final inspections — then the home is prepared for its new owners.

  • Interior finishes & millwork
  • Landscape & hardscape
  • Final inspection & completion