Lido Village Project
Home / Portfolio / Project 07

Lido Village Project

LocationLido Village, Newport Beach
TypeNew Residential Construction
Properties1
Units2
StatusIn Permitting
Project timeline

From acquisition to completion

A refined modern residence near Lido Village, designed with attention to detail from the street façade to the rooftop. Scroll down to follow each phase of the project.

01 Property Acquisition02 Demolition & Site Prep03 Forming & Foundation04 Framing & Vertical Structure05 Rough Covering06 Finishes and Completion
Property Acquisition
Property Acquisition
Slideshow
01

Property Acquisition

Phase 01 · Completed

We identify and acquire a residential property with the right fundamentals — location, lot potential and long-term neighborhood value — and plan the new home before any work begins on site.

  • Site selection & due diligence
  • Feasibility, design & engineering
  • City approvals & permits
Demolition & Site PrepDummy media #156photo
Photo
02

Demolition & Site Prep

Phase 02 · Upcoming

The existing structure is demolished and removed, and the site is cleared, excavated and compacted, leaving a clean, level pad ready for the new foundation.

  • Demolition & debris removal
  • Excavation & soil compaction
  • Graded, level building pad
Forming & FoundationDummy media #157photo
Photo
03

Forming & Foundation

Phase 03 · Upcoming

Footings are laid out and trenched, forms are set, rebar, plumbing and utility sleeves are placed, and the concrete foundation is poured and finished.

  • Layout, trenching & forming
  • Rebar, plumbing & underground utilities
  • Concrete pour & finished slab
Framing & Vertical StructureDummy media #158photo
Photo
04

Framing & Vertical Structure

Phase 04 · Upcoming

Lumber arrives on site and the home starts to rise — sill plates, floor framing, walls and roof framing form the bare-wood structure of the residence.

  • Lumber delivery & sill plates
  • Wall, floor & roof framing
  • Bare-wood vertical structure
Rough CoveringDummy media #159photo
Photo
05

Rough Covering

Phase 05 · Upcoming

The structure is closed in and made weather-tight with roof and wall sheathing, roofing, windows and doors, while rough mechanical, electrical and plumbing systems are installed and inspected.

  • Roof & wall sheathing, roofing
  • Windows, doors & weather barrier
  • Rough mechanical, electrical & plumbing
Finishes and CompletionDummy media #160photo
Photo
06

Finishes and Completion

Phase 06 · Upcoming

Interior finishes, landscaping and final inspections — then the home is prepared for its new owners.

  • Interior finishes & millwork
  • Landscape & hardscape
  • Final inspection & completion